Electron beam weld qualification and quality process
Every new part is qualified with a test piece you verify before production. The approved parameters are recorded, and each shipment comes with a quality tracking form.
Each weld is qualified part by part, with your approval

Electron beam welding is done in a vacuum chamber, and the weld parameters for each part are recorded. Once a weld is proven on a test piece, production parts are welded with the same settings.
Quality is inherent in the process.
Approval is given per part, per weld, and per parameter set. Your engineers check the test piece on their side before anything goes into production, and the approved parameters are recorded as a WPS (Welding Procedure Specification). We follow the same steps for the major oilfield service companies that list us as an approved EB welding vendor.
How a new part is qualified for production
There are six steps, starting with your quote and ending with the paperwork that ships with your parts. Previously approved parts skip the test piece.
Send your print
Send the drawing with the EB weld callout: location, depth, and tolerance. We typically return a quote within 1 day.
Weld a test piece
For a new part, we weld a test piece to the joint, depth, and tolerance on your drawing.
Cross-section, polish, and etch
The test piece is cut through the weld, polished, and etched, then evaluated for penetration, profile, integrity, and fusion.
Verify the sample
The sectioned sample goes to you to measure and test on your side. We record the weld parameters as a WPS for that part.
Approval and production
Once you approve, production parts are welded with the recorded parameters. Standard lead time is about 1–2 weeks, or 2–3 business days on expedite, quantity permitting.
Quality tracking form
A quality tracking form ships with the parts, recording how they were welded.
Quality records for every order
Each shipment includes a quality tracking form for the parts in it.
The weld parameters set from the approved sample are recorded in our database file, along with the WPS for that part. Repeat orders are welded with those settings, without a new test piece.
Our welding machines are maintained and calibrated on a regular basis.
Quality tracking form
- Part identification
Identification of the part in the shipment.
- How it was welded
A record of how the part was welded.
- Problems noted
Any problems noted before and after welding.
Send us your print
Quotes are typically returned within 1 day. Include the material, quantity, and the date you need the parts.
PDF · DWG · DXF · STEP · JPG · PNG
- Phone (713) 690-2326
- Email info@beamweld.com



